چکیده

In this paper, the build and survived railway stations over the time at which first railway line construction started at Turkey until the present had been exامینed and the ones which were out of use and lost their original function with time had been determined. Also the determined building stock had been evaluated based on the principle of giving new function to the old buildings, in especial of station buildings. The obtained data had been scanned by means of software prepared by the expert system approach in order to make a priority order for buildings. The priority order of 40 stations which found to be eligible for re-usage and had been chosen among the exامینed 580 stations had been made . In this way discarded railway heritage action plan has been prepared for the solution of problems in the state. The solution proposes is guiding many countries, especially in Turkey.